Public Projects

Public Projects

  • The Country Club/Parker Basin Area Storm Line Infiltration Project generally consists of repairs to the storm drain system within the Country Club area to eliminate the infiltration of groundwater.  The majority of the work consists of pipe lining, which will not require trenching in the roadway; however, the project does include two repairs that will require excavation and replacement of the existing storm drain pipe.  These locations are in front of 880-890 Coronado Avenue and on Sixth Street between Balboa and Coronado Avenues.  To facilitate this work, groundwater is being discharged to the outfall located at North Beach.  A permit was obtained from the Regional Water Quality Control Board (RWQCB) and the water is being tested regularly to ensure it is clean and poses no health risks.  The monitoring reports which are submitted to the RWQCB are accessible via the links below:

GROUNDWATER DISCHARGE MONITORING REPORTS
January - March 2018 April 2018 May 2018
June 2018
July 2018
Revised June & July 2018 Reports
August 2018

Completed Projects 



Download Ask Coronado App